A permit is a receipt for work that already happened. Read two permits together and you can often see the sale that did not happen. A homeowner upgraded the electrical panel but never added solar. They replaced the roof but skipped the PV. They installed solar in 2016 and never added a battery. Each of those gaps is a specific, explainable reason to call.
Why permit gaps exist
Trades sell in silos. The electrician upgrades the panel and leaves. The roofer replaces the shingles and leaves. The solar company installs panels and leaves. Nobody owns the next conversation, so the homeowner buys one piece at a time and stops when the immediate problem is solved.
For a contractor, that gap is useful. You are not cold calling about a hypothetical need. You are calling about work that is already in the record, with a logical next step that the last contractor did not offer.
Panel upgrade, no solar
A main panel upgrade to 200 amps is usually the most expensive prerequisite for residential solar. When the record shows a panel upgrade and no solar permit in the following 24 months, the homeowner has already paid for the hard part.
This is a strong solar and storage lead, and it is also a strong roofing lead if the house is old enough. The call writes itself: "I saw you upgraded the panel in 2023. Did anyone talk to you about solar after that?"
Check the amperage and the service date. A 100-amp panel upgrade to 200 amps is different from a like-for-like replacement. A panel upgrade on a house with a 15-year-old roof is also a roofing conversation, because mounting solar on a roof that will be replaced in five years is a waste of the homeowner's money.
Reroof, no PV
When a roof is replaced, the homeowner has a short window to decide whether solar goes on the new roof. If they skip it, the next solar installation means removing and reinstalling panels, or at least paying for a mount penetration plan on a roof that is already finished.
A reroof permit issued in the last 18 months with no solar permit is a timing lead. The roof is done, so the roofer is not the right caller. The solar company is. The message is concrete: the roof is new, the panels can go on now without a tear-off later.
The reverse also works. A solar permit on a roof older than 18 years is a roofing lead, because the panels will need to come off when the roof is replaced. That is a conversation most solar salespeople avoid and most roofers never start.
Solar, no storage
Solar systems installed between 2012 and 2018 were usually sized for a full-year offset under NEM 1.0 or NEM 2.0. Those customers exported excess power in the afternoon and were credited at retail rates. Under NEM 3.0, exported power is worth much less, and the economics shift toward using the power at home in the evening.
A battery changes that math. The array is already on the roof, the interconnection is already approved, and the homeowner already understands solar. The conversation is about evening rates and backup, not about whether solar makes sense.
Look for solar permits in that six-year window with no storage permit on the same parcel. That is a defined, defensible list.
Read the sequence, not the field
A lead list that shows a single permit type will miss most of this. You want the last five permits on the parcel in date order, with type and status. The sequence is what tells you whether the story is finished.
One caveat: permit data is messy. Descriptions are free text, classifications vary by jurisdiction, and some work is never permitted. Treat the absence of a permit as a question to ask, not a fact to accuse anyone of. "I didn't see a solar permit on the property" is a question. "You don't have solar" is a claim that can be wrong.
What to do with this
- Look for panel upgrades with no solar permit in the following two years.
- Treat a recent reroof with no PV as a short-window solar lead.
- Target 2012 to 2018 solar interconnections with no storage on record.
- Read permit sequences in date order, and ask rather than accuse.