How to find overdue roofs in California permit records
A practical method for reading assessor years and reroof permits to find houses that are past their shingle life, without buying a lead list.
7 min read · Checked
Most roofing crews still buy the same shared leads and call the same twenty homeowners on the same afternoon. The public record offers a quieter route: find the houses where the roof is genuinely at the end of its life, then call those owners first. The method is not complicated, but it does require knowing which fields matter.
Start with the build year, not the lead source
Every county assessor publishes a year built for each parcel. In Los Angeles that field sits in the assessor roll and in the parcel viewer. In smaller counties it is often a downloadable roll or a searchable portal. The exact build year is less important than the band: pre-1970, 1970 to 1990, 1990 to 2005, and after 2005.
The band tells you what kind of roof is probably up there. Houses from the 1950s and 1960s in Southern California often have low-slope or built-up roofs. Houses from the 1970s through the 1990s mostly have asphalt shingles or concrete tile. Houses after 2005 are usually too new to be a roofing lead unless there was a fire, a hailstorm or a bad installation.
A simple starting filter is year built before 2006. That is roughly the point where a 20-year builder-grade shingle roof installed at construction would be at or past the end of its rated life. It is not a guarantee. It is a reason to look.
Then subtract every reroof permit
Building departments publish permit histories. Los Angeles has LADBS records through its open data portal. San Francisco publishes building permits through DataSF. Sacramento publishes through its open data site and an ArcGIS service. San Diego, Long Beach and Oakland each publish their own extracts, with different field names and different freshness.
What you are looking for is a permit classified as reroof, re-roof, roofing, tear-off or shingle replacement. A reroof permit pulled in 2014 on a 1988 house moves that property out of your list. A reroof permit pulled in 1998 does not. The roof is 28 years old again.
This is where most purchased lead lists fall apart. They tend to carry a single "roof age" field with no provenance. You cannot tell whether it came from a permit, a homeowner survey or a model. When you read the permit yourself, you can defend the call: "I saw the original 1996 permit and no reroof since." That sentence gets a very different response than "our records show your roof may be aging."
Account for roof material
Asphalt shingles in California usually carry a 20 to 30 year rating, and inland heat pushes them toward the short end. Concrete tile can last 40 to 50 years. Clay tile and slate can outlive the house. A flat or built-up roof is a different trade with a different lifespan and a different buyer.
If your market is mostly tile, the build-year filter needs to move earlier. A 1990 tile roof is not overdue. A 1975 tile roof with cracked and slipped tiles is. If your market is tract homes from the 1980s and 1990s, the shingle logic works well.
You can approximate material from the assessor's building description, from aerial imagery, or from the original permit description. Whichever you use, write it down next to the lead so the person making the call knows what they are walking into.
Stack the ownership signal
A roof at the end of its life is a good lead. A roof at the end of its life on a house that sold six weeks ago is a better one. New owners tend to fix the things the previous owner deferred, and they usually do it in the first year.
County recorders publish deed transfers with recording dates. Match a transfer inside 90 days to a pre-2006 house with no recent reroof and you have a homeowner who just took on a 30-year-old roof and may not know it yet. That is not a scare tactic; it is a fact they will want to hear before the first rainy season.
Build a list you can actually work
A list of 8,000 overdue roofs is not a lead list. It is a data dump. A crew of four can work 40 to 60 new contacts a week and still follow up on the ones who asked for a quote. Sort by score, take the top 50 in the cities you serve, and call those.
Keep the reason next to every name. "No reroof since 1997" is a reason. "Roof age 29" is a number. The reason is what starts the conversation, and it is also what keeps your caller honest when the homeowner asks how you found them.
What to do with this
- Filter by build year first, then remove any parcel with a recent reroof permit.
- Check roof material before you treat a 1990s house as overdue.
- Match recent deed transfers for the strongest version of the lead.
- Work 40 to 60 names a week, not the whole county.